How Long Does It Take to Process a PBG and SLF in Indonesia?



If you are planning to build or occupy a property in Indonesia—especially in popular regions like Bali—understanding the timelines and legal requirements for the PBG (Persetujuan Bangunan Gedung or Building Approval) and SLF (Sertifikat Laik Fungsi or Certificate of Feasibility) is essential. These documents are mandatory for legal construction and occupancy and ensure that your building complies with Indonesian regulations. This comprehensive guide from The Bali Lawyer will walk you through how long it takes to process both permits and what factors influence the duration.
Understanding PBG and SLF in Indonesia
Before discussing timelines, let’s briefly clarify what these two permits entail:
PBG (Persetujuan Bangunan Gedung): Replaces the previous IMB (Izin Mendirikan Bangunan). It serves as the official permit from the local government to build or modify a structure legally in accordance with the spatial plan, building codes, and other regulations.
SLF (Sertifikat Laik Fungsi): This certificate is issued once the building is completed and declared safe for use. It ensures that the construction complies with the approved design and safety standards.
Both are essential for anyone involved in real estate development, property leasing, or private home construction in Indonesia, particularly in areas like Bali, where regulations are tightly enforced.
How Long Does It Take to Process a PBG in Indonesia?
The processing time for a PBG varies based on the type and scale of the building project. Generally, the duration includes the preparation of required documents, technical evaluations, local government approvals, and other administrative procedures.
1. Document Preparation (1–2 weeks)
The initial step includes preparing architectural drawings, land ownership proof, environmental compliance, and various technical documents. If everything is complete, this can be finalized in 7 to 14 days. Working with a professional consultant or legal service like The Bali Lawyer helps accelerate this step.
2. Submission via SIMBG System (1 day)
PBG applications must now be submitted online through the official SIMBG (Sistem Informasi Manajemen Bangunan Gedung). This government portal streamlines the application process but still requires accurate documentation.
3. Administrative Verification (3–5 working days)
After submission, the local authority reviews the application for completeness. If documents are in order, the process moves forward quickly. Any missing or incorrect information can delay the approval.
4. Technical Evaluation (7–14 working days)
The building’s design and structural safety are assessed by a technical team. This stage can take up to 2 weeks for standard residential buildings and longer for complex or commercial properties.
5. Approval and Issuance (5–10 working days)
Once the technical evaluation is complete and approved, the PBG will be issued. Typically, this occurs within another 1 to 2 weeks.
Total Estimated Time for PBG:
3 to 6 weeks, assuming all documents are correctly prepared and there are no delays or rejections.
How Long Does It Take to Process an SLF in Indonesia?
An SLF can only be obtained after the construction is completed. It involves a series of inspections to ensure the building adheres to safety, structural, and utility standards.
1. Preparation of Post-Construction Documents (1–2 weeks)
You’ll need updated architectural drawings, utility schematics (water, electricity, etc.), structural certificates, and proof of conformity with the approved PBG. This may take up to 2 weeks depending on how well the construction documentation was maintained.
2. Inspection Scheduling (3–7 working days)
Once your SLF application is submitted, the local government will schedule an on-site inspection to verify compliance. It may take up to a week to confirm the date.
3. Field Inspection and Evaluation (1–2 working days)
The inspection team reviews structural safety, fire safety, sanitation systems, and more. For residential buildings, this typically takes one day. Commercial properties or multi-story buildings may require additional time.
4. Final Approval and Certificate Issuance (7–14 working days)
If everything passes inspection, the SLF is issued within 1 to 2 weeks. Any issues found during inspection must be rectified, which can prolong the process.
Total Estimated Time for SLF:
3 to 5 weeks, depending on the type of property and completeness of documents.
Factors That Affect Processing Time
Several variables can influence how fast you obtain your PBG and SLF:
Type of Property: Commercial buildings typically require more complex documentation and inspections than residential homes.
Location: Bali’s local authorities may have different procedural efficiencies compared to other regions.
Completeness of Documents: Errors, missing files, or outdated documents can delay approval at every stage.
Contractor or Consultant Efficiency: Working with experienced legal professionals like The Bali Lawyer can significantly speed up the process.
System Delays in SIMBG: Although the SIMBG portal is designed to streamline applications, system issues or peak times can cause bottlenecks.
Can You Fast-Track the PBG or SLF Process?
While there is no formal “express” service for PBG or SLF in Indonesia, partnering with a reliable legal consultant or law service is the best way to prevent delays. Legal experts ensure that:
Documents are correctly formatted and submitted
Requirements specific to Bali’s local rules are fulfilled
All inspections and communications with the government are properly handled
This proactive approach helps avoid resubmissions, rejections, or unnecessary corrections that could extend the processing time.
Common Mistakes That Delay PBG and SLF Approval
To prevent unnecessary delays, avoid these frequent issues:
Incorrect or incomplete architectural drawings
Failure to meet zoning regulations
Missing ownership documents or building permits
Non-compliance with environmental laws
Uncoordinated utility layouts
With legal support, you can ensure every document and process step aligns with government regulations from the outset.
Why Choose The Bali Lawyer for PBG and SLF Services?
The Bali Lawyer is a professional legal service based in Bali, specializing in property law, construction compliance, and immigration. Our team has extensive experience dealing with PBG and SLF applications across Bali and other parts of Indonesia.
We offer:
End-to-end service for PBG and SLF processing
Expert guidance through SIMBG submission
Compliance checks and document preparation
Direct liaison with government departments
Support for residential, villa, commercial, and hospitality projects
By choosing us, you reduce the risk of delays, rejections, and fines—ensuring your project is built and occupied legally.
Conclusion: Don’t Let Legal Delays Hold Up Your Property Plans
Timely acquisition of a PBG and SLF is critical to your success in any property venture in Bali or elsewhere in Indonesia. While the overall process can range from 3 to 6 weeks for PBG and 3 to 5 weeks for SLF, the timeline can be significantly shortened—or prolonged—based on preparation, accuracy, and guidance.
Avoid costly delays by working with a legal service that understands the Indonesian system inside out.