Industrial Building Permit in Indonesia – Complete 2025 Legal Compliance Guide by The Bali Lawyer

Building an industrial facility in Indonesia involves more than construction—it requires careful legal preparation and regulatory compliance. Whether you’re developing a manufacturing plant, logistics center, warehouse, or factory, obtaining a valid Industrial Building Permit, known as PBG (Persetujuan Bangunan Gedung), is a mandatory step in the legal process.

At The Bali Lawyer, we specialize in helping both local and foreign investors navigate the complex legal framework related to industrial development across Indonesia. This comprehensive guide explains the steps, requirements, and legal considerations involved in obtaining an industrial building permit in 2025.


What Is an Industrial Building Permit (PBG)?

A PBG is the official authorization from the local government allowing you to construct, modify, expand, or legally use a building. The PBG replaces the former IMB (Izin Mendirikan Bangunan) system, aligning with Government Regulation No. 16 of 2021 on Buildings.

For industrial purposes, a PBG is legally required before:

  • Starting construction of a factory or warehouse

  • Renovating or expanding an existing facility

  • Changing the building function (e.g., from storage to manufacturing)

  • Applying for operational licenses or utilities

Without a PBG, the construction is considered illegal, and your investment could be at risk of government penalties, business shutdown, or demolition orders.


Who Needs an Industrial Building Permit?

You are required to obtain a PBG for industrial use if you are:

  • A local or foreign investor developing a manufacturing facility

  • A business building a warehouse, logistics center, or production plant

  • A PT PMA (foreign-owned company) establishing industrial operations in Indonesia

  • A company expanding industrial infrastructure in Java, Bali, Sumatra, Kalimantan, or other regions

We assist clients operating under various structures—from domestic companies to international enterprises.


Key Benefits of Having a Valid Industrial PBG

  • Legal protection for your industrial investment

  • Access to utilities such as electricity and water

  • Ability to apply for SLF (Function Worthiness Certificate)

  • Compliance with regional zoning and industrial regulations

  • Eligibility to obtain environmental permits and operational licenses

  • Avoidance of fines, suspensions, or government enforcement action


Legal Land Status for Industrial Development

Before applying for a PBG, you must ensure the land you’re building on is zoned for industrial use and has legal ownership or usage status.

You will need:

  • HGB (Hak Guna Bangunan): The right to use land for building, valid for 30 years and extendable

  • A legal lease or purchase agreement

  • Zoning suitability: Land must be located in an industrial zone (Kawasan Industri)

Our legal team can verify land certificates, assess zoning compliance, and assist in converting land use if required.


Industrial Building Permit Requirements in 2025

To secure a PBG for industrial purposes, you must fulfill a range of administrative, legal, and technical requirements:


1. Land Ownership or Usage Documentation

  • HGB certificate or long-term lease

  • AJB (Sale and Purchase Deed)

  • Land map and coordinates

  • Proof of zoning compatibility (KKPR)


2. Company Legal Documents

  • NIB (Business Identification Number)

  • NPWP (Tax Identification Number)

  • Company establishment deed (for PT, CV, or PT PMA)

  • Domicile letter and business license

These confirm your legal standing as a company operating in Indonesia.


3. KKPR (Zoning and Spatial Planning Approval)

KKPR (Kesesuaian Kegiatan Pemanfaatan Ruang) is required to confirm that the land can legally be used for industrial construction.

It ensures that your building plans match government spatial plans, environmental standards, and industrial zones.


4. Technical Construction Drawings

Detailed construction plans must be submitted, including:

  • Site layout plans

  • Floor plans and building sections

  • Structural details (columns, slabs, foundations)

  • Mechanical, electrical, plumbing (MEP) systems

  • Drainage and sewage systems

  • Fire safety and emergency exits

  • Utility and logistics zones

  • Accessibility and safety features

All plans must be created and signed by licensed architects and engineers with valid SIPB licenses.


5. Construction Supervision Plan

Your project must be supervised by certified professionals throughout the construction phase. This includes:

  • Architect supervision

  • Civil engineer reports

  • Contractor compliance

  • Safety and quality assurance

You’ll need to submit documentation of these responsibilities when applying for your PBG.


6. OSS RBA Submission

All PBG applications must be submitted through the OSS RBA (Online Single Submission – Risk-Based Approach)platform, which categorizes projects based on risk level.

Steps include:

  • Registering or updating your NIB

  • Inputting land, company, and building data

  • Uploading technical and legal documents

  • Self-assessment checklist for risk category

  • Tracking application and approval status

We handle this digital process on your behalf, ensuring accuracy and regulatory compliance.


7. Environmental Approvals (AMDAL or UKL-UPL)

For industrial buildings, you must also comply with environmental regulations, which may include:

  • AMDAL (Environmental Impact Analysis) for high-risk projects

  • UKL-UPL (Environmental Management and Monitoring Efforts) for mid-scale projects

These must be completed before your PBG is approved and submitted through the same OSS platform.


8. Inspection and Approval

Once submitted, your application may trigger:

  • Document verification by local government agencies

  • On-site inspection by civil engineers or building officials

  • Cross-check of land use and zoning from the regional planning department

We coordinate inspections and liaise with government officials to ensure no delays or rejections.


SLF (Function Worthiness Certificate) After Construction

After your industrial facility is built, you must apply for an SLF (Sertifikat Laik Fungsi). This certificate confirms that your building:

  • Matches the approved PBG plans

  • Is structurally safe and legally functional

  • Complies with health, safety, and environmental regulations

The SLF is required before starting any operations. We also assist with the complete SLF application and renewal process.


PBG Validity and Renewal

The PBG remains valid as long as the building follows the approved plans. If you:

  • Modify the function of the building

  • Expand or renovate the facility

  • Change the ownership or business use

you must update your PBG accordingly. Our team can manage renewals and modifications for existing industrial buildings.


Timeline and Processing Duration

On average, the timeline for obtaining a PBG is:

  • Simple facilities: 3–6 weeks

  • Complex industrial sites: 2–3 months

Timelines vary based on project scope, document readiness, and inspection schedules.


Cost Considerations

The cost of obtaining a PBG depends on several factors:

  • Size and classification of the industrial building

  • Number of required technical drawings and consultants

  • Location and government service fees

  • OSS and environmental approval fees

  • Legal and professional services

We provide transparent, customized quotes based on your project scope.


Common Pitfalls to Avoid

  • Building in non-industrial zones without conversion

  • Submitting incomplete or incorrect documents to OSS

  • Using unlicensed professionals for technical drawings

  • Failing to obtain environmental approvals

  • Ignoring the need for an SLF after construction

Avoid costly mistakes by partnering with a professional legal team that understands every aspect of the process.


Why Choose The Bali Lawyer?

We are a trusted law firm based in Bali with extensive experience helping local and international clients handle industrial permits and property legalities across Indonesia.

We offer:

  • End-to-end legal assistance from land analysis to SLF certification

  • Land acquisition and zoning support

  • Architectural and engineering coordination

  • Full OSS RBA platform management

  • Inspection coordination and post-construction compliance

  • Services across Jakarta, Bali, Surabaya, Java, Kalimantan, and beyond

Our goal is to make your industrial development smooth, legal, and successful.